Racing teams on the other hand, will be checking their boats and rigging constantly, and SmartRigging will assist them to get the maximum out of the rigging. We will cooperate to find the optimum between reliability and performance. The SmartRigging service schedule is determined with two parameters:

Sailing time:
1. Less then five weeks a year
2. Five to 30 weeks a year
3. More then 30 weeks a year

Sailing intensity:
1. Cruising
2. High performance / offshore cruising
3. Racing

After choosing the right sailing time per year and sailing intensity the appropriate service schedule can be found with the Service Matrix. There are five possible schedules from A to E, ranging from just an annual visual inspection to a full monitoring system to replace stays at exactly the right moment.





SCHEDULE

A.
1. Annual Visual Inspection (AVI) of the complete rigging by a SmartRigging specialist.
2. Replacement of runners, checkstays, removable forestays after 4 years.
3. Replacement of the complete rigging after 8 years.

B.
1. AVI
2. Stretch test after 4 years of selected cables.
3. Replacement of runners, checkstays, removable forestays after at least 4 years,
depending on the test results.
4. Replacement of complete rigging after at least 8 years, depending on the test results.

C.
1. AVI
2. Stretch test every two years of selected cables.
3. Replacement of runners, checkstays, forestays and diagonals at least every four years, depending on
the test results.
4. Replacement of complete rigging after at least 8 years, depending on the test results.

D.
1. AVI
2. Stretch tests after the first year or after the first 30.000 nautical miles (whichever comes first) of
selected cables.
3. Depending on the results of the first test and the sailing program for the following period the interval for
the next test will be determined.
4. Replacement of runners, checkstays, forestays and diagonals at least every four years, depending on
the test results.
5. Replacement of complete rigging after at least 8 years, depending on the test results.

E.
1. Exact replacement schedule is made together with skipper, depending on sailing program.

Note:
For the schedules D and E it is highly recommended to have the SmartMonitoring System incorporated into the rigging to be able to make the right choices on replacement and maintenance at the right moment.